Shipping to and from Italy
Your complete guide to shipping to and from Italy. Find the right route, get Maersk office locations, discover local solutions, payment options and more.
Export
Get up-to-date local information about export procedures and restrictions, demurrage and detention, container drop-offs and more.
Container Shifting Origin (CSO) – Italy to World
Revised Container Shifting Origin (CSO) charge from Italy, effective 15th September 2019.
The Container Shifting Origin Fee is applied for changes received later than 5 calendar days before vessel departure. Charge applies if one container of the involved shipment has gated into the terminal. Changes refer to:
- Change of the departure vessel
- Reduction in the number of containers
The Container Shifting Origin Fee is a fixed amount of 90 EUR and it is applied per container.
Besides the Container Shifting Origin Fee, if there are any other costs occurred due to the requested changes, those will be charged separately.
Cancellation Fee (CLL) – Italy to World
Revised Cancellation Fee (CLL charge), in Italy, effective 15th September 2019.
The Cancellation Fee is applied for changes received later than 5 calendar days before vessel departure. Changes refer to:
- Booking cancellation (irrespective if the shipment has gated in or not yet)
- Reduction in the number of containers before any container has gated in
- Not showing up within gate-in deadline
The Cancellation Fee is a fixed amount and it is applied per container, as follows:
- Dry Containers: EUR 50
- Reefer Container: EUR 100
- Special Equipment (Open Top, Flat Rack, 45’): EUR 150
Besides the Cancellation Fee, if there are any other costs occurred due to the requested changes, those will be charged on top.
Applicable from 1/1/2017
Our setup in Italy consists of two elements: Combined Detention and Demurrage and Storage
This means you will have one combined free time period and compensation for utilization of equipment inside and outside of terminals or depots, referred to as Combined Demurrage & Detention (presently named Detention), Compensation related, but not limited to the utilization of the port, terminal or depot facilities will be charged separately as Storage (presently named Demurrage)
Storage start to apply as from GATE IN to SAME DAY of LOAD. Reefer include Electricity and Monitoring.
Combined Detention and Demurrage starts to apply as from GATE OUT EMPTY to SAME DAY of LOAD,
Calculation is based on CALENDAR days.
Export Storage (DRY and Special)
From Gate in full day to Load day included
Port | Days | 20' EURO per DAY | 40' EURO per DAY |
---|---|---|---|
Port
Genoa / Vado Ligure
|
Days
0 to 9
10 to 14 15 to 21 22 onward |
20' EURO per DAY
0
15 20 30 |
40' EURO per DAY
0
30 40 60 |
Port
Leghorn
|
Days
0 to 7
8 to 14 15 to 21 22 onward |
20' EURO per DAY
0
15 20 30 |
40' EURO per DAY
0
30 40 60 |
Port
Civitavecchia
|
Days
0 to 7
8 to 21 22 onward |
20' EURO per DAY
0
15 30 |
40' EURO per DAY
0
30 60 |
Port
La Spezia
|
Days
0 to 7
8 to 12 13 to 21 22 onward |
20' EURO per DAY
0
15 25 30 |
40' EURO per DAY
0
30 40 60 |
Port
Napoli
|
Days
0 to 7
|
20' EURO per DAY
0
|
40' EURO per DAY
0
|
Port
Flavio Gioia Terminal
|
Days
8 to 21
22 onward |
20' EURO per DAY
15
30 |
40' EURO per DAY
30
60 |
Port
Salerno
|
Days
0 to 7
8 to 21 22 onward |
20' EURO per DAY
0
15 30 |
40' EURO per DAY
0
15 60 |
Port
Gioia Tauro
|
Days
0 to 7
8 to 14 15 to 21 22 onward |
20' EURO per DAY
0
15 25 30 |
40' EURO per DAY
0
30 45 60 |
Port
Catania
|
Days
0 to 7
8 to 21 22 onward |
20' EURO per DAY
0
15 30 |
40' EURO per DAY
0
30 60 |
Port
Ancona
|
Days
0 to 14
15 to 21 22 onward |
20' EURO per DAY
0
15 30 |
40' EURO per DAY
0
30 60 |
Port
Ravenna
|
Days
0 to 7
8 to 14 15 to 21 22 onward |
20' EURO per DAY
0
15 20 30 |
40' EURO per DAY
0
30 45 60 |
Port
Trieste
|
Days
0 to 7
8 to 21 21 onward |
20' EURO per DAY
0
10 30 |
40' EURO per DAY
0
20 60 |
Port
Venice
|
Days
0 to 7
8 to 14 15 to 21 22 onward |
20' EURO per DAY
0
8 10 30 |
40' EURO per DAY
0
16 20 60 |
Export Combined Demurrage&Detention (Dry and Special)
From Empty pick day to Load day included
Port | Days | 20' EURO per DAY | 40' EURO per DAY |
---|---|---|---|
Port
All ports
|
Days
0 to 12
13 to 15 16 onward |
20' EURO per DAY
0
30 60 |
40' EURO per DAY
0
40 80 |
Export storage (REEFER/Dangerous)
From Gate in full day to Load day included
Port | Days | 20' EURO per DAY | 40' EURO per DAY |
---|---|---|---|
Port
All ports (except Genoa, Vado, Napoli, Catania)
|
Days
0 to 3
4 onward |
20' EURO per DAY
0
100 |
40' EURO per DAY
0
150 |
Port
Salerno (ONLY REEFER).
|
Days
0 to 3
4 onward |
20' EURO per DAY
0
100 |
40' EURO per DAY
0
150 |
Port
Genoa / Vado Ligure
|
Days
0 to 5
6 onward |
20' EURO per DAY
0
100 |
40' EURO per DAY
0
150 |
Port
Catania
|
Days
0 to 4
5 onward |
20' EURO per DAY
0
100 |
40' EURO per DAY
0
100 |
Port
Napoli(ONLY REEFER).
|
Days
0 to 4
5 onward |
20' EURO per DAY
0
100 |
40' EURO per DAY
0
150 |
Port
Napoli Dangerous.
|
Days
IMO Storage fees at Naples are invoiced by terminal Soteco directly to Customers
|
20' EURO per DAY
IMO Storage fees at Naples are invoiced by terminal Soteco directly to Customers
|
40' EURO per DAY
IMO Storage fees at Naples are invoiced by terminal Soteco directly to Customers
|
Port
Napoli and Salerno Dangerous
|
Days
IMO Storage fees at Naples and Salerno are invoiced by terminals directly to Customers
|
20' EURO per DAY
|
40' EURO per DAY
|
Export combined demurrage & detention (REEFER/Dangerous)
From Empty pick day to Load day included
Port | Days | 20' EURO per DAY | 40' EURO per DAY |
---|---|---|---|
Port
All ports (except Genoa, Vado, Napoli, Catania)
|
Days
0-6
7-onward |
20' EURO per DAY
0
100 |
40' EURO per DAY
0
150 |
Port
Genoa / Vado Ligure
|
Days
0 to 8
9 onward |
20' EURO per DAY
0
100 |
40' EURO per DAY
0
150 |
Port
Napoli / Catania
|
Days
8 onward
|
20' EURO per DAY
100
|
40' EURO per DAY
150
|
Commodity
- Sanitary check: not possible in Catania.
- Military Cargo and Ammunition: shipments via Gioia Tauro require clearance by Italian Authorities (6 days before vessel arrival).
Weight / Measurement
Gross weight limitation is defined as follows:
- container + truck + chassis + cargo: max kgs 44,000
- 20ft: max net weight 21.6 tons (i.e. cargo weight)
- 20ft omologated 30 tons: max net weight 27.5 tons (i.e. cargo weight)
- 40ft or 40hc: max net weight 26.48 tons (i.e. cargo weight)
- 45ft: max net weight 25.6 tons (i.e. cargo weight)
- Max height over the road: 4.3 metres
Special Cargo
- OOG, B/B and IMO cargo subject to standard Maersk approval procedures
IMO:
- Ancona, Catania, Palermo: IMO 1 and IMO 7 are not accepted
- Trieste: IMO 1 and IMO 7 are accepted after approval
- Genoa: IMO 1, IMO 6.2 and IMO 7 are not accepted
- Ravenna and Gioia Tauro: IMO 1, IMO 6.2 e IMO 7 are not accepted - IMO 1.4G - 1.4S are accepted after approval
- Salerno: IMO 1, IMO 1.4S, IMO 5.2 , IMO 6.2 and IMO 7 are not accepted
- Venice: IMO 1, IMO 5.2 IMO 6.2 and IMO 7 are not accepted - IMO 1.4G and 1.4S can be accepted after approval
- Leghorn: No limits
- Civitavecchia: Only IMO 3.2, IMO 3.3, IMO 4.1, IMO 5.2, IMO 6.1, IMO 8 and IMO 9 are accepted
- Naples: No IMO are accepted
- Milan depot: IMO 1, IMO 2, IMO 7 are not accepted and IMO 3, IMO 4, IMO 5, IMO 6 are acceptable only "in transit" i.e. units must leave depot same day of trains arrival/departure.
Notes:
- Positioning of IMO cargo subject 48 hrs pre-advice;
- Railing of IMO cargo to be accepted on case by case basis;
- IMO cargo for loading must be at terminals 4 hrs before vessel arrival;
- IMO cargo discharged must leave terminals not later than 24 hrs after vessel arrival.
- TANK containers with IMO cargo not accepted due to Rina regulation;
- For Imo Gate -in authorization from La Spezia, please contact it.export@maersk.com. No charges applied.
- For Imo Gate -in authorization from Leghorn, please contact it.export@maersk.com. Applicable charge 130 Euro.
No acceptance
Cargo to/from Cagliari (Sardinia island) not accepted as insurance coverage offered by ferry company not in line with Maersk requirements.
Due to the increase in certificate requests, we would like to share with you a brief description of general clauses acceptance and feasibility* In case you do not find below the case that potentially reflects your situation, or you still have some concerns, please contact your usual Custom Service contact.
Here is a brief list of clauses which are usually acceptable:
- Cold treatment execution, if this treatment has been requested form Customer and execution has been confirmed from Maersk
- Vessel flag details or statement declaring vessel has or does not have a specific flag
- Statement declaring vessel will call or will not call specific ports, unless in distress or subject to force majeure or upon request of competent authorities
- Free time applied. This is usually acceptable if related to the booking. Certain destinations do not authorize to insert the free time on Bill of lading or certificates. In any case, if the free time is valid as per service contract/destination/booking, it will be granted.
- Reefer container type with indication of set temperature
- Port of loading or discharge name if that exact name is reflected on our list of port aliases
Here is a brief list of clause types which are generally not acceptable:
- Not specific or measurable
- In conflict with pre-printed terms and conditions of the bill of lading
- Apply burdens on Maersk which cannot be measured, prevented or fulfilled.
For example:
- Clean on Board
- Handling clauses like handle with care, glass with care
- Use no Hooks
- Stating the origin of goods (made, manufactured, growth in…)
- Stating the quality of packing (i.e. packed on strong, dry, seaworthy cases or boxes)
- Stating a specific container position on ship (i.e. stored under deck, away from boiler and engine)
- Stating a specific transshipment port or absence of transshipment port
* Please note this list is general and indicative. It is subject to change and it cannot constitute a confirmation of certificate or bill of lading feasibility related to a specific booking or booking request. The acceptance of a clause can be influenced by specific booking parameters.