Inland services in Slovakia
Supported inland service modes in Slovakia
Location and depot | Feeder | Rail | Truck |
---|---|---|---|
Location and depot
Bratislava - Bratislava Terminal
|
Feeder
|
Rail
Yes
|
Truck
Yes
|
Location and depot
Dunajska Streda - Metrans Dunajska Streda
|
Feeder
|
Rail
Yes
|
Truck
Yes
|
Location and depot
Kosice - Metrans Kosice
|
Feeder
|
Rail
Yes
|
Truck
Yes
|
Location and depot
Sladkovicovo - Sladkovicovo Terminal
|
Feeder
|
Rail
|
Truck
Yes
|
Intermodal Conditions for Slovakia file contain all necessary information that are need to realize transport with Maersk and Sealand.
Most important notes:
- Free time for loading/unloading and customs clearance since arrival to the first delivery place is:
- 4 hours for RCO (rail + truck);
- Trucking transport can be cancelled till 10:00 one working day before loading/delivery for free. After that cancellation fee apply which is 240 EUR per container. If the container has already left the terminal, the late cancellation fee is calculated as per the real occurred costs.
- Surcharge for transportation of dangerous goods (IMO) equals to 35 EUR per box. IMO classes 1 and 7 are not accepted.
Inland Rate Lookup
What is the easiest way to get price for your inland transport? Use Inland Rate Lookup tool available for:
In easy and transparent way you will see how much cost your import or export request. It contain different weight bands and mode of transports.
Inland rates
Rates below are for reference only, please contact your local representative to confirm inland rates.
Q3 rates latest update was on 13.06. 2021
Rate validity from 1 July 2022 till 30 September 2022 based on PCD (Price Calculation Date)*.
Q2 rates latest update was on 17.3.2022
Rate validity from 1 April 2022 till 30 June 2022 based on PCD (Price Calculation Date)*
Customs clearance services
If you are interested in customs clearance services pls reach out directly to your SAL representative.
Disclaimer
PCD (Price Calculation Date) - it is the date from which Maersk determine the applicable tariff, contract rate or surcharges, which need to be applied to a shipment. For NON-FMC shipments, the PCD is the ‘scheduled departure date /ETD’ of the first water leg at the time of Booking Confirmation. For FMC shipments, the PCD is the last container GATE-IN date of the shipment.
Surcharge code | Surcharge name | Rate |
---|---|---|
Surcharge code
DDC
|
Surcharge name
Destination Dangerous Cargo Service (Inland Haulage)
|
Rate
35 EUR per container
|
Surcharge code
ODC
|
Surcharge name
Origin Dangerous Cargo Service (Inland Haulage)
|
Rate
35 EUR per container
|
Surcharge code
WTO
|
Surcharge name
Waiting Time Origin
|
Rate
30 EUR per hour, no more than 240 EUR per day
|
Surcharge code
WTD
|
Surcharge name
Waiting Time Destination
|
Rate
30 EUR per hour, no more than 240 EUR per day
|
Surcharge code
ICE
|
Surcharge name
Inland Cancellation Fee Export
|
Rate
Please see Intermodal conditions
|
Surcharge code
ICI
|
Surcharge name
Inland Cancellation Fee Import
|
Rate
Please see Intermodal conditions
|
Surcharge code
IWO
|
Surcharge name
Container Weighing - Origin
|
Rate
45 EUR per container
|
Surcharge code
MSI
|
Surcharge name
Multi Stop Service Imports
|
Rate
Calculated individually, please contact your Sales or Customer Service Representative.
|
Surcharge code
MSE
|
Surcharge name
Multi Stop Service Exports
|
Rate
Calculated individually, please contact your Sales or Customer Service Representative.
|
Surcharge code
POS
|
Surcharge name
Positioning charge
|
Rate
275 EUR/20'OT, FR and 495EUR/40'OT, FR
OT(Open top), FR(Flat rack)
|
Disclaimer
PCD (Price Calculation Date) - it is the date from which Maersk determine the applicable tariff, contract rate or surcharges, which need to be applied to a shipment. For NON-FMC shipments, the PCD is the ‘scheduled departure date /ETD’ of the first water leg at the time of Booking Confirmation. For FMC shipments, the PCD is the last container GATE-IN date of the shipment.
Q3 DRP/PIC rates valid from 1.7.2022 – 30.9.2022 based on PCD (Price Calculation Date)*
Disclaimer
PCD (Price Calculation Date) - it is the date from which Maersk determine the applicable tariff, contract rate or surcharges, which need to be applied to a shipment. For NON-FMC shipments, the PCD is the ‘scheduled departure date /ETD’ of the first water leg at the time of Booking Confirmation. For FMC shipments, the PCD is the last container GATE-IN date of the shipment.You may also be interested in
Reach the full potential by letting us simplify and connect your supply chain from end to end.