Shipping to Kuwait
Booking Process & Cut-offs
Deadline | |
---|---|
Deadline to place new booking | 10 days prior vessel arrival |
Dry booking confirmation | Within 2 hours |
Dangerous cargo booking confirmation | Within 24-48 hours |
Dangerous good declaration submission | 48 hours prior Shipping Instruction cut-offl |
Shipping Instructions submission | 48 hours prior vessel arrival |
FULL Container Gate-In cut off | 24 Hours Prior vessel arrival |
Verify Copy issuance | 8 working hours if Shipping Instruction submitted online |
12 working hours if Shipping Instruction submitted manually | |
Original Bill of Lading /Sea Way BL issuance | After Vessel sailing and payment settlement. |
Equipment release
SHUWAIKH
- Once you receive the “Container Release Order”, you can arrange to pick the empty container along with the Carrier Seals from CTS control depot, Shuwaikh as per your convenience.
- You may collect below forms from our office:
- Empty container release note- To collect empty container
- Export shipping note – To gate in container full
Shuaiba
- Once you receive the “Container Release Order”, you can arrange to pick the empty container CTS control depot, Shuaiba as per your convenience.
- You may collect below forms from our office:
- Empty container release note- To collect empty container
- Export shipping note – To gate in container full
- Seal needs to be collected from Maersk Office after booking is confirmed.
Demurrage and Detention
Combined Export Detention & Demurrage Charges and freetime
Calculation Timeline Gateout - container LOAD
(Amount per day per container)
Equipment Type | Detention charges | 20ft | 40/45 |
---|---|---|---|
Dry | 1-14days | Free | Free |
Next 10 days | KWD3 | KWD6 | |
Next 10 days | KWD6 | KWD12 | |
Thereafter | KWD12 | KWD24 | |
Reefer | 1-7days | Free | Free |
Next 10 days | KWD16 | KWD32 | |
Next 10 days | KWD32 | KWD64 | |
Thereafter | KWD64 | KWD128 | |
Specialized Container | 1-10days | Free | Free |
Next 10 days | KWD6 | KWD12 | |
Next 10 days | KWD12 | KWD24 | |
Thereafter | KWD24 | KWD48 |
Restrictions
Routing:
At present we have Container Yard (CY) acceptance at Shuwaikh and Shuaiba Terminal. In case of any exception required, please check with our operations department Kw.export@maersk.com
Weight / Measurement:
There is no weight limitation other than the maximum weight as stipulated on the Container Safety Convention (CSC) plate of the container, failure to abide will result the container not to be loaded.
Shuwaikh and Shuaiba port’s gantry crane has maximum weight limitation of 40 metric tons. For over weight containers discharged, double handling charges are imposed (i.e. containers in excess of 24 mts/20' and 30 mts/40' & 45'; an additional cost of KWD 22/20', KWD 38/40', and KWD 50/45').
Break Bulk and Out of Gauge cargo need prior confirmation from Maersk Kuwait Kw.export@maersk.com and has to be delivered directly to the shipside.
For cargo over 29 metric tones , request via mail to Kw.export@maersk.com is mandatory prior acceptance and loading of cargo in order to arrange special cranes. Failing in sending request prior loading of container will be concluded as erroneous declaration and container will be either kept on board or will incur claims/fine.
Special Cargoes :
Hazardous (IMO) cargo is subject to approval from Kw.export@maersk.com prior acceptance and loading. Below specific IMO class cargo has to be arranged as mentioned:
- IMO class 6.1 must be delivered at shipside, to be loaded directly on vessel.
- IMO class 7 is not acceptable to be loaded on our vessel.
- During the summer months(June to August), IMO class 1 and 3 must be delivered at ship side, to be loaded directly on vessel.
No Less Container Load (LCL) or Container Freight Station (CFS) delivery is acceptable.
Contact us
If you want to speak to a sales person about a new shipment or if you have a question about your existing shipment, you can email us and we will respond within the next two days. If you have a more immediate question, you can search for help online.